Permit-Driven Testing

Every wastewater discharge permit has specific monitoring requirements, and every missed parameter or late report carries real consequences. Eastex provides the full suite of wastewater analysis required for TPDES compliance, backed by the regulatory expertise to help you interpret results and file on time.

We know the parameters on your permit because we've been running them for facilities like yours for nearly 40 years. When your results look unusual, we don't just report the number. We flag it, we call you, and we help you figure out what's happening before your next DMR is due.

Eastex field technician collecting a wastewater sample from a treatment plant hatch

Testing Capabilities

Comprehensive wastewater analysis for every parameter on your permit.

Conventional Parameters

  • BOD / CBOD
  • COD
  • TSS / TDS
  • pH
  • Temperature
  • Dissolved Oxygen
  • Turbidity
  • Oil & Grease (EPA 1664A)

Nutrients

  • Ammonia
  • TKN
  • Nitrate / Nitrite
  • Total Nitrogen
  • Total Phosphorus
  • Orthophosphate

Nutrient limits are increasingly common on Texas permits. We can help you monitor trends before limits become enforceable.

Metals

  • ICP-OES metals scan
  • ICP-MS trace metals
  • Mercury
  • Chromium (total and hexavalent)
  • Lead, Copper, Zinc
  • Priority pollutant metals

Bacteriological

  • Fecal Coliform
  • E. Coli
  • Enterococcus
  • Total Coliform

Toxicity & Organics

  • Whole Effluent Toxicity (WET)
  • VOCs
  • SVOCs
  • Pesticides / Herbicides
  • PCBs

Sludge & Biosolids

  • TCLP
  • Paint Filter Test
  • Land Application
  • Percent Solids
  • Total/Fecal Coliform (biosolids)

Complete sludge disposal testing for land application, landfill, and beneficial reuse compliance.

Compliance Support

Testing is half the job. The other half is making sure your results get reported correctly and on time. Eastex provides end-to-end compliance support for wastewater operations:

  • DMR filing — We complete and submit discharge monitoring reports through NetDMR, verified for accuracy before they go to the state.
  • TCEQ electronic reporting — All required data submitted electronically and confirmed received.
  • Permit limit alerts — Our LIMS flags results approaching your permit limits. You hear it from us first.
  • Pretreatment programs — Manhole sampling, source identification, and grease trap compliance. Sampling, analysis, and reporting handled as a complete service.
  • Regulatory guidance — When permit requirements change, we help you understand what's different and what you need to do.

For a deeper look at our compliance capabilities, see our Regulatory Compliance page.

BOD bottles arrayed for wastewater analysis

Who We Serve

Eastex provides wastewater testing for the full range of Texas dischargers. Whether you operate a single facility or manage compliance for dozens of districts, we scale our service to match your operations.

  • Municipal Utility Districts with TPDES discharge permits
  • Operations companies managing wastewater compliance across multiple facilities
  • Sewage treatment plants (STPs) and wastewater treatment facilities
  • Industrial facilities with process wastewater discharge
  • Engineering firms conducting discharge assessments or permit applications

Ready to Get Started?

Whether you're looking for a new lab partner or just have questions about testing requirements, we're here to help.

Monday through Friday, 8:00 AM to 5:00 PM